Contents
-
Introducing Nomad 7.0.200
-
Implementing Nomad
-
Working with Nomad
-
Core features
-
Advanced features
-
ActiveEfficiency features
-
OS Deployment features
-
OS deployment task sequences
-
Set Nomad as download program
-
Create Nomad application policy
-
Delete Nomad application policy
-
Disable Run from distribution point
-
Enable Run from distribution point
-
Install and configure Nomad in WinPE
-
Install 1E Client
-
Get migration settings
-
Peer backup assistant Provision Nomad PBA data store
-
Peer backup assistant Finalize Nomad PBA data store
-
Peer backup assistant Locate existing Nomad PBA data store
-
Peer backup assistant Release Nomad PBA data store
-
Pre-stage content using Nomad
-
Save Nomad cache
-
Restore Nomad cache
-
Stage 1E Client Package
-
1E WSA Actions
-
Peer backup assistant Close Nomad PBA data store
-
Peer backup assistant High-availability
-
Redirect content location to the Nomad cache
-
Set Nomad as download program
-
Peer Backup Assistant - PBA
-
OS deployment task sequences
-
Nomad tools
-
Operational best practices
-
Frequently asked questions
-
Core features
-
Troubleshooting
-
Training
-
Reference
This custom task sequence action closes the connection after user state is saved by USMT Capture User State. The Peer backup assistant Provision Nomad PBA data store and USMT Capture User State actions must have been run.
Actions | Notes |
---|---|
When run, this task:
| This task sequence action:
|
Configurable parameters
Parameter | Default value | Description |
---|---|---|
Name | Peer backup assistant: close Nomad PBA data store | Name for the custom task sequence action. |
Description | Action to close the PBA data store connection after saving user state | Description for the custom task sequence action. |